XT-10000 in Gulf Copper dry dock

Story of the Month: The XT-10000 Project

Innovating Maritime Solutions: The XT-10000 Project

We at Gulf Copper and Manufacturing and Gulf Copper Energy Services (GCES) are excited to share some thrilling news regarding our ongoing support for the XT-10000, the largest heavy-lift vessel in the United States. Our team has been diligently working to ensure that this remarkable vessel operates at peak performance, and we are proud to announce that we will be undertaking essential maintenance during its upcoming stay at our facility on the 35,000-t dry dock in Galveston.

This maintenance will include critical tasks such as repainting and thruster servicing, which are vital for the XT-10000’s operational efficiency. Our dedicated GCES team has provided rigging, lifting, inspections, and HSE support for several years, ensuring that the vessel remains in top condition while out in the field. Our shipyard team will now dry dock the vessel.

(more…)

Read More
OOS Winches

Story of the Month: Independencia II Mooring

Reinforcing Independence:
OOS-Enabled Independencia II Mooring System Upgrade

The maritime industry demands constant innovation, pushing the boundaries of logistics to achieve ambitious goals. We thrive on these challenges at Gulf Copper Energy Services (GCES). Our recent work on the OOS-enabled Independencia II, a heavy-lift vessel operating in demanding offshore environments, exemplifies our commitment to delivering complex projects with precision and efficiency. This wasn’t just maintenance but a transformation, bolstering the vessel’s capabilities and extending its operational lifespan.

The project centered around a significant upgrade to the vessel’s mooring system foundation. This involved enhancing the vessel’s structural integrity to accommodate two fairleads on each column and two winches on each deck’s four corners—a crucial upgrade for increased stability and operational flexibility in challenging offshore conditions. The scale of this undertaking was substantial, requiring the installation of 160 tons of prefabricated steel, meticulously distributed with 40 tons allocated to each column.

Our scope extended beyond mere installation. It encompassed a comprehensive approach, from the initial fabrication and assembly of components at our Galveston yard to the final installation and alignment of critical machinery onboard the vessel. This included precise winch gearbox and motor alignment, ensuring optimal performance and longevity, and fitting operator cabins for enhanced crew comfort and operational control.

The project commenced in early September 2024 and is expected to conclude in mid-March 2025. The fabrication phase alone, conducted at our state-of-the-art Galveston facility, demanded approximately 20,000 man-hours of skilled labor. Our team meticulously cut, prepped, and welded steel components into precise installation pieces, adhering to the highest quality and safety standards.

The logistical complexities of this project were considerable. Transporting the fabricated steel, specialized tools, and essential equipment required a carefully orchestrated multi-modal approach. 162 pallets were dispatched via 31 truck shipments from our GCES facility to the shipping company in Fort Lauderdale, Florida, with departures staggered between September 21, 2024, and January 13, 2025. From there, 13 separate sea freight shipments conveyed the cargo to Curacao, where the Independencia II was located.

Independencia II SF Winch

Independencia II SF Winch

On board the vessel, a dedicated team of 65 skilled professionals worked tirelessly to execute the installation. Led by Shaun Flower (Project Manager) and Emilio Guzman (Project Supervisor), the team included seven additional supervisors overseeing a highly trained workforce of welders and fitters sourced from our Mexico office. This collaborative effort resulted in approximately 70,000 onboard man-hours, encompassing the core installation and additional tasks crucial to the vessel’s operational readiness.

The success of this project is not just measured in tons of steel or man-hours but also in the positive feedback received from our client. Christopher Stephen Hawkins, Project Planner/Document Controller for OOS, commended our team’s professionalism and near-perfect safety record. He specifically highlighted the strong leadership of Shaun and Emilio, recommending them for advancement, and praised the dedication and skill of the entire welding and fitting crews. Further feedback from OOS Project Manager Eddie Sarkis acknowledged the excellent quality of work, strong supervision, and the team’s adaptability in performing tasks beyond their assigned trades. He noted their willingness to assist with winch alignment and responsiveness to changing project requirements.

The Independencia II project underscores GCES’s capabilities in delivering complex, large-scale marine solutions. We are proud of our team’s dedication, expertise, and commitment to safety and quality, and we look forward to continuing to provide innovative solutions for the maritime energy sector.

Read More
Eclipse Drydock at Gulf Copper

Scenic Eclipse Back in Action

Scenic Eclipse Back in Action Thanks to Gulf Copper’s Swift Drydock Expertise

The luxury expedition ship Scenic Eclipse has returned to service following critical repairs conducted at Gulf Copper’s Galveston shipyard. The vessel, known for its adventurous itineraries, experienced propulsion issues in September, necessitating an urgent drydock to replace a faulty Azipod.

Gulf Copper’s team swiftly responded to the challenge, accommodating the 228-guest ship and facilitating the complex repair process. Remarkably, the replacement Azipod was delivered to the shipyard via a chartered Antonov 124 aircraft, one of the world’s largest cargo planes, highlighting the scale and urgency of the operation.

(more…)

Read More
2024 International WorkBoat Show

GC Sets Sail for the International WorkBoat Show 2024!

The Future; Underway

New Orleans, LA – Nov 12-14, 2024

The maritime world is gearing up for the biggest event of the year—the International WorkBoat Show 2024! From November 12-14, New Orleans will be buzzing with the latest innovations and industry insights. And Gulf Copper will be right in the heart of it all.

This year’s WorkBoat Show promises to be bigger and better than ever, with a focus on “The Future; Underway.” Attendees can expect:

  • Cutting-edge technology: Explore the newest advancements in vessel design, propulsion systems, and subsea solutions.
  • Expert insights: Learn from industry leaders at the WorkBoat Conference Program.
  • Networking opportunities: Connect with thousands of professionals, from vessel owners and operators to vendors and suppliers.
  • Exciting events: Don’t miss the State of the Jones Act Breakfast, the Significant Boats Awards, and much more!

Visit Gulf Copper at Booth #1854

(more…)

Read More
GCES Safety Award

Story of the Month: GCES Celebrates a Decade of Safety Excellence

GCES Safety AwardGulf Copper Energy Services (GCES) recently received a prestigious merit certificate from Signal Management Services, marking an impressive milestone: ten years without a Lost-Time Incident (LTI). This achievement underscores GCES’s unwavering commitment to safety in the offshore and marine shipping industries’ challenging and often high-risk environments.

Senior GCES management proudly accepted the award on behalf of the dedicated employees whose daily vigilance and commitment to safe practices made this milestone possible. This accomplishment is not merely a statistic; it represents countless hours of training, meticulous planning, and a shared culture of prioritizing safety.

GCES recognizes that safety is an ongoing journey. While celebrating this remarkable accomplishment, the company reaffirms its commitment to continuous improvement. It constantly seeks opportunities to enhance its safety protocols and empower employees to work in the safest possible conditions. This dedication protects the workforce, fosters operational efficiency, and strengthens GCES’s reputation as a reliable and responsible partner in the energy sector.

Congratulations to Gulf Copper Energy Services on this outstanding achievement!

Read More
GCES Rope Teams support the Dali-Baltimore bridge project with rigging to remove cargo containers

Story of the Month: GCES Rope Teams Rise to the Challenge

Gulf Copper Energy Services Rope Teams Rise to the Challenge at Dali/Baltimore Bridge Incident

When disaster strikes, Gulf Copper Energy Services (GCES) is ready to respond. This month, our highly skilled rope access team demonstrated their expertise and dedication in a critical situation involving the Dali/Baltimore Bridge. When a vessel collided with the bridge, causing significant damage and threatening the integrity of the structure, GCES was called upon to provide essential rigging support for the removal of unstable cargo containers.

Our rope team, renowned for their experience in challenging environments, worked tirelessly alongside other emergency responders to secure the area and develop a safe removal plan. Using specialized rigging techniques and their in-depth knowledge of rope access systems, our team safely removed the containers, preventing further damage to the bridge and ensuring the safety of everyone involved. This swift and effective response is a testament to the professionalism and dedication of our GCES rope access team, highlighting Gulf Copper’s commitment to providing exceptional services in even the most demanding situations.

Read More
Battleship Texas at Gulf Copper facilities for restoration

Gulf Copper Proudly Supports Battleship Texas’ Historic Restoration

At Gulf Copper, we’ve always been honored to play a role in preserving history. That’s why we’re thrilled to be a part of the ongoing restoration of the Battleship Texas, a legendary World War II vessel that bravely fired the first shots on D-Day. This iconic ship, a symbol of American courage and resilience, served our country with distinction, participating in numerous battles and earning 11 battle stars.

The Battleship Texas Foundation, a dedicated non-profit organization, has embarked on an ambitious $35 million restoration project to ensure this historic ship can continue inspiring future generations. Gulf Copper is proud to be a partner in this effort, contributing our expertise and world-class facilities at the Gulf Copper Dry Dock & Rig Repair in Galveston, Texas.

The extensive restoration efforts, which have been underway since 2022, have already seen over 700 tons of steel replaced and the hull repainted. With the ship successfully refloated in March 2024, the focus is shifting towards restoring the interior spaces, replacing the wood deck, and finalizing the navigation bridge.

We firmly believe that the Battleship Texas is a national treasure that deserves to be preserved. It’s a tangible reminder of the sacrifices made by those who fought for our freedom.

Learn more about the Battleship Texas’ incredible journey and this historic restoration project:

KXAN News: Inside Battleship Texas’ Historic Comeback 80 Years After D-Day
https://www.kxan.com/news/texas/inside-battleship-texas-historic-comeback-80-years-after-d-day/

Read More
Gulf Copper enrolls in Green Marine Program

Gulf Copper Enrolls in the Green Marine Program

Galveston Shipyard Environmental Policy and Green Marine Program Participation

Gulf Copper & Manufacturing has enrolled its Galveston shipyard in the Green Marine program. Green Marine is a voluntary environmental certification program for the North American marine industry that provides a roadmap for Gulf Copper to meet its environmental goals. The program evaluates participating shipyards, ship owners, terminals, and port authorities based on established air, land, and water pollution performance indicators. 

“Gulf Copper looks forward to participating in the Green Marine program and utilizing the principles and guidance to foster a culture of environmental stewardship,” said Mike Haughton, Gulf Copper ESH Manager. “We’re committed to identifying industry best practices to continually improve our environmental performance now and in the near future.” (more…)

Read More

Offshore Wind Feeder Barge conversion

Gulf Copper delivers a successful project for Van Oord, with the Offshore Wind ‘Feeder Barge’ conversion from our Port Arthur shipyard.

Thank you Van Oord, for your trust.

Many thanks to Rick Bruinsma for your support and assistance throughout the project.

 

Read More
Battleship USS Texas

Battleship Texas New Home at Pier 21 in Galveston

GALVESTON, Texas – After years of planning, the Battleship Texas Foundation is nearing final agreements with both Landry’s Inc. and the Port of Galveston to dock the historic USS Texas permanently at Pier 21.

Tony Gregory, President/CEO of the Battleship Texas Foundation, announced Thursday that the Foundation is approximately 60 days away from signing contracts with both parties. Landry’s operates several attractions adjacent to Pier 21, including the Harbor House Hotel and Willie G’s Seafood & Steaks. If finalized, the agreements would provide a long-term home for the deteriorating but iconic 110-year-old battleship following recent restoration work.

Mark Ashwell, Director of Business Development at Gulf Copper Dry Dock & Rig Repair, where restoration on the USS Texas began in September 2022 stated, “This will be a great enhancement for Galveston City and its people, as it will keep the iconic battleship in Texas and improve the overall tourist experience on the island.

The Battleship Texas will allow people from all over the country to tour the battleship to feel nostalgic and see the once state-of-the-art technology and engineering marvel of the only remaining World War I Dreadnought.”

(more…)

Read More